4.2 Positioning
NOTICE
Damage to components if handled incorrectly
Follow the transport instructions on the packaging
Transport components with care to avoid damage
Protect the packaging against damp conditions
Pay attention to the pallet's centre of gravity when lifting
Position a fork-lift or similar lifting device at the pallet and bring in the components
If the boiler cannot be brought in on the pallet:
remove the cardboard and take the boiler off the pallet
⇨ See "Remove boiler from pallet" [page 25]
Positioning using a crane
Attach the crane hook to the attachment point correctly and position the boiler
4.2.1 Temporary storage
If the system is to be assembled at a later stage:
Store components at a protected location, which is dry and free from dust
Damp conditions and frost can damage components, particularly electric ones!
4
Assembly
Positioning
24 Froeling GesmbH | A-4710 Grieskirchen, Industriestraße 12 | www.froeling.at

Table of Contents

Other manuals for Froling S3 Turbo

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Froling S3 Turbo and is the answer not in the manual?

Froling S3 Turbo Specifications

General IconGeneral
BrandFroling
ModelS3 Turbo
CategoryBoiler
LanguageEnglish

Related product manuals