EasyManua.ls Logo

Froling S3 Turbo - 3.2.4 Heating up the boiler

Froling S3 Turbo
67 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4.3 Setting up in the boiler room
4.3.1 Remove boiler from pallet
Remove the cardboard with the controller from the boiler and put in a safe place
Lift the cardboard box with the insulation from the pallet
Remove the transport locks
A total of four screws, left/right, front/rear
Lift boiler from pallet
TIP: use Froling’s KHV 1400 boiler lifting system to help remove the pallet!
4.3.2 Moving the boiler in the boiler room
Position a fork-lift or similar lifting device with a suitable load-bearing capacity at
the base frame
Lift and transport to the intended position in the installation room
Observe the minimum distances in the boiler room.
Assembly
4
Setting up in the boiler room
Installation Instructions S3 Turbo | M1081217_en 25

Table of Contents

Other manuals for Froling S3 Turbo

Related product manuals