Table of Contents
1 General 4
1.1 About this manual 4
2 Safety 5
2.1 Hazard levels of warnings 5
2.2 Qualification of assembly staff 6
2.3 Personal protective equipment for assembly staff 6
2.4 Design Information 7
2.4.1 Notes on standards 7
General standards for heating systems
7
Standards for structural and safety devices
7
Standards for heating water
7
Regulations and standards for permitted fuels
8
2.4.2 Installation and approval of the heating system 8
2.4.3 General information for installation room (boiler room) 8
2.4.4 Requirements for central heating water 9
2.4.5 Notes for using pressure maintenance systems 11
2.4.6 Return lift 11
2.4.7 Combination with storage tank 12
2.4.8 Chimney connection/chimney system 14
Draught limiter
14
Measuring port
14
Boiler data for planning the flue gas system
15
3 Technology 16
3.1 Dimensions 16
3.2 Components and connections 17
3.3 Technical specifications 18
4 Assembly 23
4.1 Materials supplied 23
4.1.1 Tools required 23
4.2 Positioning 24
4.2.1 Temporary storage 24
4.3 Setting up in the boiler room 25
4.3.1 Remove boiler from pallet 25
4.3.2 Moving the boiler in the boiler room 25
4.3.3 Minimum distances in the boiler room 26
4.4 Before Installation 26
4.4.1 Changing door stops (as needed) 26
Converting the fuel loading door
28
4.4.2 Fitting the door handles 29
4.4.3 Setting and checking the seal on the doors 29
Positioning the doors
31
4.5 Installing the boiler 32
4.5.1 Assembly overview 32
Insulation
32
Air duct system
34
Table of Contents
2 Froeling GesmbH | A-4710 Grieskirchen, Industriestraße 12 | www.froeling.at