WOS system S3 Turbo 20-30
35
WOS system S3 Turbo 40-45
36
4.5.2 Fit flue gas pipe nozzle and the induced draught fan 37
4.5.3 Installing the pneumatic rods for the primary and secondary air 37
4.5.4 Final steps before insulating 39
4.5.5 Installing the insulation 39
4.5.6 Installing the door switch 42
4.5.7 Installing the back panel 42
4.5.8 Aligning the insulation and attaching the controller 43
4.5.9 Installing the cleaning port door and blank cover 45
4.5.10 Installing the insulated door 45
4.5.11 Fitting the sensors 48
4.5.12 Install the broadband probe (only with S-Tronic Lambda) 48
4.5.13 Installing the WOS system 49
4.5.14 Installing the manual controller/servo-motors 50
Mount the manual controller (with S-Tronic Plus control)
50
Mounting the servo-motors (with S-Tronic Lambda control)
50
Fit the cover plate.
51
4.6 Power connection and wiring 52
4.6.1 S-Tronic Plus / S-Tronic Lambda control 52
Power connection
52
Hydraulic system
53
4.6.2 Information on circulating pumps 54
Connecting a high efficiency pump
54
Connecting a squirrel cage standard pump
55
4.6.3 Concluding work 56
4.7 Connecting the hydraulic safety devices 57
5 Start-up 58
5.1 Before commissioning / configuring the boiler 58
5.2 Initial startup 59
5.2.1 Permitted fuels 59
Firewood
59
5.2.2 Fuels permitted under certain conditions 60
Wood briquettes
60
5.2.3 Non-permitted fuels 60
5.2.4 Heating up for the first time 61
Boiler with Lambda control
61
Boiler with manual controller
62
6 Decommissioning 65
6.1 Mothballing 65
6.2 Disassembly 65
6.3 Disposal 65
7 Appendix 66
7.1 Pressure equipment regulation 66
7.2 Addresses 67
7.2.1 Address of manufacturer 67
7.2.2 Address of the installer 67
Table of Contents
Installation Instructions S3 Turbo | M1081217_en 3