5 Decommissioning
5.1 Mothballing
The following measures should be taken if the boiler is to remain out of service for
several weeks (e.g. during the summer):
❒
Clean the boiler thoroughly and close the doors completely.
If the boiler is to remain out of service during the winter:
❒ Have the system completely drained by a qualified technician.
➥ Protection against frost
5.2 Disassembly
To disassemble the system, follow the steps for assembly in reverse order.
5.3 Disposal
❒ Ensure that the system is disposed of in an environmentally sensitive way in
accordance with waste management regulations.
❒
You can separate and clean recyclable materials and send them to a recycling
center.
❒ The combustion chamber must be disposed of as construction waste.
Decommissioning
5
Mothballing
Montageanleitung S3 Turbo | M1870119_en-us 71