3 Assembly
3.1 Materials supplied
1 Boiler 8 Cardboard box containing small parts
2 Insulation 9 Pneumatic rods, complete
3 Controller 10 Ash shovel
4 EOS system (heat exchanger
optimisation system)
11 Cleaning kit
5 Flue gas pipe nozzle 12 Cleaning brush, small
6 Ceramic fiber seal 13 Cleaning brush, large
7 Induced draft fan
Not pictured: installation and operating instructions, guarantee certificate, identification
plate
3.1.1 Tools required
The following tools are required for assembly:
❒
Spanner or box wrench set (widths across flats 8 - 32 mm)
❒ Set of Allen keys
❒ Flat head and cross-head screwdrivers
❒ Hammer
❒ Diagonal cutting pliers
❒ Half-round file
❒ Power drill or cordless screwdriver with Torx bit insert
3
Assembly
Materials supplied
34 Froling GesmbH | A-4710 Grieskirchen | www.froeling.com