Table of Contents
1 Safety 5
1.1 Explanation of symbols 5
1.2 Permitted Uses 7
1.3 Requirements at the place of installation 8
1.3.1 Approval for the heating system 8
1.3.2 Space required 8
1.3.3 Requirements for central heating water 9
1.3.4 Ventilation requirement for boiler room 10
1.3.5 Requirements for the heating system 10
1.3.6 Requirements for the boiler room 10
1.3.7 Combination with thermal storage 11
1.3.8 Return temperature control 11
1.3.9 Requirements for the chimney connection 12
Basic data for designing the chimney connection
12
1.4 Safety markers 13
1.4.1 Mandatory signs 13
1.4.2 Prohibitions 15
1.4.3 Warning signs 15
1.4.4 Signage on the boiler 16
Notice of risks during installation
16
Notice of risks during operation
17
Notice regarding procedures in an emergency
18
1.5 Residual risks 19
1.5.1 Basic risks 19
1.5.2 Risks from electricity 19
1.5.3 Danger from fire and explosion 20
1.5.4 Danger from high temperatures 22
1.5.5 Risks from flue gases, lubricants and other equipment 23
1.6 What to do in the case of danger 24
1.7 Staff requirements 25
1.8 Personal protective equipment 27
1.9 Replacement parts 28
1.10 Environmental protection 29
1.11 The operator's responsibilities 30
2 Technology 31
2.1 Dimensions 31
2.2 Components and connections 32
2.3 Technical data 33
3 Assembly 34
3.1 Materials supplied 34
3.1.1 Tools required 34
3.2 Positioning 35
3.2.1 Temporary storage 35
3.3 Setting up in the boiler room 36
Table of Contents
2 Froling GesmbH | A-4710 Grieskirchen | www.froeling.com