3.5.4 Final steps before insulating
Remove the side blanking plate and cleaning door
Remove plugs, then seal and screw in the immersion sleeve (A) for thermal
discharge safety device sensor
Remove the screw cap from the side on which the heat-exchanger lever will be
mounted later and replace it with a brass bushing (B)
Tighten the brass bushing (B) with Allen wrench (SW 27 mm)
3.5.5 Installing the insulation
NOTICE
Several parts of the boiler are covered with a protective film. This film MUST be
removed before assembly!
Push in the floor insulation
3
Assembly
Installing the boiler
50 Froling GesmbH | A-4710 Grieskirchen | www.froeling.com

Table of Contents

Other manuals for Froling S3 Turbo

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Froling S3 Turbo and is the answer not in the manual?

Froling S3 Turbo Specifications

General IconGeneral
BrandFroling
ModelS3 Turbo
CategoryBoiler
LanguageEnglish

Related product manuals