EasyManua.ls Logo

Fronius TTB 80 G - Disposal; Maintenance at Every Start-Up

Fronius TTB 80 G
304 pages
Go to English
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Maintenance at
every start-up
- Check wearing parts, replace faulty wearing parts
- Purge the gas nozzle of welding spatter
In addition to the above list of steps to be carried out at every start-up, for water-cooled
welding torches:
- Ensure that all coolant connections are leak-tight
- Ensure that there is a proper coolant return flow
Disposal Materials should be disposed of according to valid local and national regulations.
91
EN-US

Table of Contents

Related product manuals