EasyManua.ls Logo

Fujitsu 5GRUDB3 - Installation

Fujitsu 5GRUDB3
111 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4
Installation
In this chapter:
4.1 Unpack
4.2 Mounting
4.3 Installation Precautions
4.4 Returning of Defective Equipment
4.5 RU Installation
4.6 Cable Installation
e following sections describe how to aach the RU to a wall or pole using a mounting kit.
Caution: U
se care when handling the RU, as it is heavy. Fujitsu
recommends installing the RU on a two-person team to avoid
damage to the unit or injury to the user.
Aention: Manipulez le RU avec précaution car il est lourd. Fujitsu
recommande d'installer le RU sur deuxéquipe de personnes pour
éviter d'endommager l'unité ou de blesser l'utilisateur.
Caution: If the RU is to be installed at high location on a pole,
Fujitsu recommends using liing equipment to hoist the RU by a
pair of eye bolts mounted on the RU.
Aention: Si le RU doit être installé en hauteur, Fujitsu
recommande d'utiliser un équipement de levage pour l'EF par une
paire de boulons à œil montés sur l'EF.
Installation
84
Release 1.0 · Issue 1.1, May 2021
Fujitsu and Fujitsu Customer Use Only