EasyManua.ls Logo

GE AKTA ready XL

GE AKTA ready XL
172 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6 Operation
A
bout this chapter
This chapter provides the information required to start, run and shut down ÄKTA
ready XL after a run.
For instructions on method/phase creation and results evaluation, refer to the con-
trol software user documentation.
Note: Make sure the installation steps described in the previous chapter have
b
een performed.
In this chapter
Section See page
6.1 Connect a column 131
6.2 Run a method 134
6.3 Controlled shutdown and removal of flow kit 139
Precautions
WARNING
B
efore attempting to perform any of the procedures described in
this chapter, you must read and understand all contents of the
corresponding section(s) in the links as listed below:
G
eneral precautions, on page 13
Personal protection, on page 15
Operation, on page 18
6 Operation
130
ÄKTA ready XL Operating Instructions 29281616 AE
*** TeDIS Valid on Date Printed Printed on: 15-09-2023 11:27:35 ***

Table of Contents

Related product manuals