EasyManuals Logo

GE AKTA ready XL User Manual

GE AKTA ready XL
172 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #134 background imageLoading...
Page #134 background image
6.2 Run a method
I
ntroduction
Running a method or phase on ÄKTA ready XL can be a largely automatic procedure.
User interaction can be mainly required in the preparation phase, which includes
connecting the column and the required containers, checking that all connections
are correctly assigned, and that flow kit type and volumes are correct. For further in-
formation on method creation, refer to the relevant control software documenta-
tion.
This section describes an example on how to start, monitor, end and evaluate a run
using UNICORN control software.
For other control softwares, refer to the software documentation to create similar
methods.
Precautions
WARNING
B
efore attempting to perform any of the procedures described in
this chapter, you must read and understand all contents of the
corresponding section(s) in the links as listed below:
G
eneral precautions, on page 13
Personal protection, on page 15
Operation, on page 18
Start a run
Starting a run is done from UNICORN after first having checked that all inlets and
outlets are correctly assigned and that the volumes of inlet and outlet containers are
correct.
Make sure the installation switch is set to Run.
Step Action
1 In the S
ystem Control module, click Run on the File menu.
6 Operation
6
.2 Run a method
134
ÄKTA ready XL Operating Instructions 29281616 AE
*** TeDIS Valid on Date Printed Printed on: 15-09-2023 11:27:35 ***

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE AKTA ready XL and is the answer not in the manual?

GE AKTA ready XL Specifications

General IconGeneral
BrandGE
ModelAKTA ready XL
CategoryMedical Equipment
LanguageEnglish

Related product manuals