EasyManua.ls Logo

GE AKTA ready XL

GE AKTA ready XL
172 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Connect a packed column with
b
ypass lines/valves
Follow the instruction below to connect a pre-packed column with bypass lines/
valves to ÄKTA ready XL.
Step Action
1 Connect tubing between the column bottom and the system valve marked
C
OLUMN BOTTOM.
2 Connect tubing between the column top and the system valve marked
COLUMN TOP.
3 Set the system column valves to the UpFlow position.
4 Using the pump, fill the system with an appropriate liquid for column in-
stallation.
5 When the system, including the tubing connected to the column, is filled
with liquid, stop the pump.
6 Use the manual valves on the column to change from bypass to inline.
Final considerations
O
nce the column is connected, make sure to activate the system alarm or alarms
again after the filling sequence.
6 Operation
6
.1 Connect a column
ÄKTA ready XL Operating Instructions 29281616 AE 133
*** TeDIS Valid on Date Printed Printed on: 15-09-2023 11:27:35 ***

Table of Contents

Related product manuals