• K
nife
NOTICE
D
o not use a forklift to remove the system from the crate. The sys-
tem must be rolled out using the enclosed ramp.
Step Action
1 Remove the bolts marked with black circles supporting the short ends of
t
he crate.
2 Remove both short ends of the crate.
3 Remove the accessory boxes inside the crate.
4 Remove the fastened ramp from the crate.
5 Open the pump wagon door at the front of the system and remove the
pump supports on the crate floor.
6 Secure the pump wagon to the system with the two locking pins located on
the inside of the pump frame. Close the pump wagon door.
Note:
Turn the locking pin anticlockwise to lock. The pump wagon may need to be
moved slightly for the locking pins to fit.
7 Remove the upper and side beams at the back of the system.
4 Installation
4
.2 Transport and moving of the system
ÄKTA ready XL Operating Instructions 29281616 AE 79