EasyManuals Logo

GE Druck ADTS 405 R Mk2 User Manual

GE Druck ADTS 405 R Mk2
140 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #34 background imageLoading...
Page #34 background image
Chapter 3. Getting Started
16 | ADTS 405 R/F Mk2 Instruction Manual-English © 2017 General Electric Company – All Rights Reserved.
3.2.2 Power-up
a. Check the power indicator is illuminated and set the front panel power switch to
OPERATE.
b. The display will show the following sequence:
1. Display power-up screen. The display, on the front panel or hand-terminal,
shows the following. The system status indicator LED is initially colored red,
this is normal.
Note: Vxx.xx will display the current software version number.
2. Controller power-up screen. After a short time the display shows the
following. The system status indicator LED changes to orange in color.
3. Date of the last calibration and type of main transducer fitted.
Note: Date format can be set to a leading value of day or month in SETUP.
4. Self-test message and front panel LED status. The system status LED changes
to green in color.
LDK 425 Vxx.xx
Display Power Up
Please Wait
SYSTEM STATUS
DRUCK
ADTS 405
DKxxx
VER xx.xx
SYSTEM STATUS
Last Calibration
Date dd/mm/yy (DMY)
RPT Transducer
PLEASE WAIT
Self Test
PLEASE WAIT
SYSTEM STATUS

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE Druck ADTS 405 R Mk2 and is the answer not in the manual?

GE Druck ADTS 405 R Mk2 Specifications

General IconGeneral
BrandGE
ModelDruck ADTS 405 R Mk2
CategoryTest Equipment
LanguageEnglish

Related product manuals