4 Facility Supplied System Interconnects Specifications
NOTICE
On installation sites in China, please make sure that the power cables and
ground cables provided by customers have China Compulsory Certification
(CCC). This information is supplied to the customer by Part Number 5159493
'China Power Cable Requirements'.
The following table lists the required facility supplied system interconnects. Refer to Illustration
6-7 for additional information.
Table 6-8: Facility Supplied System Interconnects
Group
Between Units
Comments Requirements
From To
C01 Facility Power MDP Facility Power and Ground MR Suite Electrical Require‐
ments
C02 MDP ICC ICC Power
C03 MDP ISC PDU Power
Facility Cooling
Water
ICC Cooling Water Supply MR System Facility Water
Requirements
Facility Cooling
Water
ICC Cooling Water Return
C04 Facility Network MON Facility must provide network/tele‐
phone access for the Magnet Moni‐
tor (MON) and Global Operator
Cabinet (GOC). The MON connec‐
tion must be available at all times.
Magnet Monitor (MON) Re‐
quirements and Specifica‐
tions
Facility Network GOC
C05 MDP E-Off Switch Facility must supply cable from
MDP to E-Off Switch in Equipment
Room
MR Suite Electrical Require‐
ments
Facility Power Outlet near MON Facility outlet for MON power Magnet Monitor (MON) Re‐
quirements and Specifica‐
tions
Facility Power MRU Facility power to MRU Magnet Room Equipment
Specifications
Table 6-9: Optional Facility Supplied System Interconnects
Group
Between Units Comments Requirements
Facility Power Outlet near MRE Facility outlet for MRE power (option‐
al, not shown)
Magnetic Resonance Elastogra‐
phy (MRE) Specifications
SIGNA Voyager Pre-Installation
Direction 5680008–1EN, Revision 2
144 4 Facility Supplied System Interconnects Specifications