11  MR System Shipping and Receiving
NOTICE
All shipping dimensions and weights are approximate and may vary based on
ship-to location, required rigging, or other requirements. Some shipping or
access routes may have requirements in addition to those listed in this section.
Contact the GE Healthcare Project Manager of Installation (PMI) to verify magnet
shipping, rigging, and access.
11.1  Receiving Requirements
1. The customer must provide an area for unloading system components from the truck and
delivering to the MR suite
NOTE:
Contact the GE Healthcare Project Manager of Installation (PMI) for a list of
experienced rigging companies.
2. The customer is responsible for ensuring:
a.
All floors along the route will support the weight of the magnet (GE Healthcare
recommends a structural analysis)
b.
Doors or other openings are sufficiently wide to allow passage
c.
Sufficient room is provided for any required rigging tools
11.2  Facility Delivery Route Requirements
The following table lists the delivery dimensions of system components. The delivery route must
be planned to accommodate the dimensions listed.
Table 2-15:  Delivery Route Requirements
Component
Width Depth Height Weight
Notes
in mm in mm in mm lbs kg
Magnet See Magnet shipping dimensions Table 2-16
Cryogen Dimensions vary depending on dewar type used. Verify with cryogen supplier.
ISC Cabinet See ISC dimensions in ISC Cabinets are moved with
casters attached under the
base of each cabinet.
ICC Cabinet
See ICC dimensions in ICC
SIGNA Voyager Pre-Installation
Direction 5680008–1EN, Revision 2
54 11  MR System Shipping and Receiving