a. Manufacturer
b. Model
c.
Serial number
d.
Current calibration date and calibration due date
13. Results of the dock-table anchor pull test.
5.4.3 Dock Frame Anchor Mounting Requirements
Illustration 3-4: dock frame anchor Mounting Options
1. The RF Shield vendor must design and install the dock frame anchor bolt
2.
The dock frame anchor hole must be drilled before the Magnet is delivered
3. Refer to Finished Room Requirements for dock frame anchor hole locations
4. The dock frame anchor must not contact floor rebar or other structural steel
5. The dock frame anchor must electrically contact the RF shield at point of entry
6. The dock frame anchors must have the following properties:
a. Anchors must be two-part assembly (male/female)
b.
Female side must be expansion- or epoxy-type
c.
Male side must be a bolt or threaded rod with appropriate-sized nut (bolt or rod must be
removable--not epoxied or cemented in place) without breaking the RF seal.
d.
Anchors must be electrically conductive
SIGNA Voyager Pre-Installation
Direction 5680008–1EN, Revision 2
70 5 RF Shielded Room Requirements