EasyManua.ls Logo

GE Xcellerex XDM Series - Page 134

GE Xcellerex XDM Series
322 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
ActionStep
Turn down the top nut (1) with your fingers to the support plate, and tighten
it slightly with a wrench.
3
1
2
Turn down the securing nut (2) with your fingers to the top nut, and tighten
it slightly with a wrench.
4
Repeat steps 2 to 4 for all four jacking bolts installed on the mixer.5
Result: The jacking bolts are engaged and the load cells are protected from
possible damage caused by movement.
134 Xcellerex XDM 50-1000, XDUO 100-1000 mixers Operating Instructions 29251615 AD
6 Preparation
6.2 Stabilize the mixer vessel
6.2.1 Use jacking bolts

Table of Contents

Related product manuals