7.5.8.5 Power Priority
Figure 7.43 Power Priority
This setting is used to set the priority between Active Power Control (Watt) and
Reactive Power Control (Var).
YES=<ENT> NO=<ESC>
Select: Var First
Two options are available: Watt First and Var First.
This function is for maintenance personnel only, wrong operation
will prevent the inverter from reaching maximum power.
7.5.8.6 Initial Settings
In initial settings it will reset each work mode from 6.5.8.1 to 6.5.8.4 back to default.
Figure 7.44 Initial Settings
Work Mode Default
Power Rate Default
Set the voltage at the PCC point.
This setting is required by RULE 21 requirements.
PCC: Point of Common Coupling, the point where a Local EPS is connected to an Area EPS.
6.7.8.7 Voltage PCC Set
This function is for maintenance personnel only, wrong operation
will prevent the inverter from reaching maximum power.
7. Normal operation
NOTE
NOTE

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Ginlong Solis 5G Series and is the answer not in the manual?

Ginlong Solis 5G Series Specifications

General IconGeneral
BrandGinlong
ModelSolis 5G Series
CategoryInverter
LanguageEnglish

Related product manuals