03 MANUAL OPERATION User Manual V1.3-2021-12-15
3.4 CEI Auto-Test Function
3.5 Startup/shutdown Procedure
3.3 SEMS Portal
1. When you want to shut down the inverter during an event, you shall turn o the inverter DC
switch and the battery DC breaker.
2. When you want to start-up the inverter after rectication, you shall turn on the inverter DC
switch and the battery DC breaker.
The PV auto-test function of CEI is integrated into the PV Master App to satisfy Italian safety
requirements. For detailed instructions regarding this function, please refer to "PV Master
Operation Instructions".
SEMS Portal App
SEMS Portal is an online monitoring system. After completing the
installation of communication connection, you can access www.semsportal.
com or download the app by scanning the QR code to monitor your PV plant
and device.
Please contact the after-sales for more operation of SEMS Portal.