4.3 Disclaimer
The inverters are transported, used and operated under environmental and electrical conditions.
The manufacturer has the right to not provide after-sales services or assistance under the
following conditions:
• The inverter is damaged during transfer.
• The inverter is out of the warranty year and an extended warranty is not purchased.
• The inverter is installed, retted, or operated in improper ways without authorization from the
manufacturer.
• The inverter is installed or used under improper environmental or technical conditions (as
mentioned in this User Manual) and without authorization from manufacturer.
• The installation or conguration of the inverter does not follow the requirements mentioned in
this User Manual.
• The inverter is installed or operated contrary to the requirements or warnings mentioned in
this User Manual.
• The inverter is broken or damaged by any force majeure, such as lightening, earthquake, re
hazard, storm and volcanic eruption etc.
• The inverter is disassembled, changed or updated on software or hardware without
authorization from the manufacturer.
• The Inverter is installed, used, or operated against any related provisions contained in
international or local policies or regulations.
• Any incompatible batteries, loads or other devices are connected to the system.
• Specications are subject to change without notice. Every eort has been made to make
this document complete, accurate and up-to-date. However, GoodWe may need to make
some improvements under certain circumstances without advance notice. GoodWe shall not
be responsible for any loss caused by this document including, but not limited omissions
errors,typographical errors, arithmetical errors or listing errors in this document.
If you have any questions or suggestions, please contact GoodWe after-sale.
Note: The manufacturer retains the right to explain all of the contents in this User Manual. To insure
IP66, the inverter must be sealed well; please install the inverters within one day of unpacking; otherwise,
please seal all unused terminals /holes; unused terminals/holes are not allowed to remain open; and
conrm that there is no risk of water or dust entering any terminals/holes.
Maintenance
Maintaining Item Maintaining Method Maintaining Period
System Clean
Check the heat sink, air intake, and air
outlet for foreign matter or dust.
Once 6-12 months
Electrical Connection
Check whether the cables are securely
connected. Check whether the cables are
broken, or whether there is any exposed
copper core.
Once 6-12 months
Sealing
Check whether all the terminals and ports
are properly sealed. Reseal the cable hole
if it is not sealed or too big.
Once a year
THDi Test
For Australia requirements, in the THDi
test, there should add Zref between
inverter and mains.
RA=0, 24; XA=j0,15 at 50Hz;
RN=0, 16; XN=j0,10 at 50Hz
As needed

Other manuals for Goodwe BT Series

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Goodwe BT Series and is the answer not in the manual?

Goodwe BT Series Specifications

General IconGeneral
BrandGoodwe
ModelBT Series
CategoryInverter
LanguageEnglish

Related product manuals