EasyManuals Logo

Graco Reactor 2 E-XP2 Operation

Graco Reactor 2 E-XP2
74 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #60 background imageLoading...
Page #60 background image
Maintenance
Flush Flush
Flush
Inlet Inlet
Inlet
Strainer Strainer
Strainer
Screen Screen
Screen
Theinletstrainers󰘰lteroutparticlesthatcanplugthe
pumpinletcheckvalves.Inspectthescreensdailyas
partofthestartuproutine,andcleanasrequired.
Isocyanatecancrystallizefrommoisture
contaminationorfromfreezing.Ifthechemicalsused
arecleanandproperstorage,transfer,andoperating
proceduresarefollowed,thereshouldbeminimal
contaminationoftheA-sidescreen.
Note
CleantheA-sidescreenonlyduring
dailystartup.Thisminimizesmoisture
contaminationbyimmediately󰘱ushing
outanyisocyanateresidueatthestartof
dispensingoperations.
1.Closethe󰘱uidinletvalveatthepumpinletand
shutofftheappropriatefeedpump.Thisprevents
materialfrombeingpumpedwhilecleaningthe
screen.
2.Placeacontainerunderthestrainerbasetocatch
drainoffwhenremovingthestrainerplug(C).
3.Removethescreen(A)fromthestrainer
manifold.Thoroughly󰘱ushthescreenwith
compatiblesolventandshakeitdry.Inspectthe
screen.Nomorethan25%ofthemeshshould
berestricted.Ifmorethan25%ofthemeshis
blocked,replacethescreen.Inspectthegasket
(B)andreplaceasrequired.
4.Ensurethepipeplug(D)isscrewedintothe
strainerplug(C).Installthestrainerplugwiththe
screen(A)ando-ring(B)inplaceandtighten.Do
notovertighten.Letthegasketmaketheseal.
5.Openthe󰘱uidinletvalve,ensurethatthereare
noleaks,andwipetheequipmentclean.Proceed
withoperation.
Figure15
60333023M

Table of Contents

Other manuals for Graco Reactor 2 E-XP2

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Graco Reactor 2 E-XP2 and is the answer not in the manual?

Graco Reactor 2 E-XP2 Specifications

General IconGeneral
BrandGraco
ModelReactor 2 E-XP2
CategoryPaint Sprayer
LanguageEnglish

Related product manuals