G16 Smoke Density Monitor
Ver.2.4 – Revision March 2022 13
4 Control at Delivery
All products of Green Instruments A/S are individually checked throughout and carefully
packed.
Check the equipment upon arrival, ensuring that the equipment has been transported
properly.
Check for the absence of any damage. If these are noted, immediately make a note on the
delivery document. Remove the packing and check for intrusive water or signs of humidity.
Check for missing part against the packing list. Any discrepancy or damage should be re-
ported to the Green Instruments A/S immediately.