EasyManua.ls Logo

GREEN INSTRUMENTS G16 - Control and Monitoring Unit Installation

Default Icon
46 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installation
20
5.2.6 Control and Monitoring Unit
The control and monitoring unit handles up to two (2) sets of transceiver/reflector units. It
is recommended to install the control and monitoring unit in an easily accessible location.
The information of the control and monitoring unit relevant for installation is provided in
Figure 5-5.
5.2.7 Junction Box (Optional)
The junction box is an optional item used in cases where the cable between the Control
and Monitor unit and the Transceiver exceeds 15 meters and/or in cases where multiple
transceivers are daisy chained together. If the scope of supply includes a junction box, the
junction box is pre-mounted with a connection cable for easy connection to the transceiver.
The information of the junction box relevant for installation is provided in Figure 5-6.

Table of Contents