Introduction
Page 8 of 46
• The air module is arranged with purge air supply connection and flow control valve for
optimal airflow adjustment.
• A sealing air system including 9m purge air hose and a purge air distributor.
• A G16 reflector module assembly, which contains a precision reflector to direct the
light beam back to the transceiver assembly.
• A connection cable of 15 m for connection between the transceiver and the control and
monitoring unit.
• Two welding sockets 1” for the transceiver and the reflector assemblies.
Download the product certificates at https://greeninstruments.com/
1.3.2 Optional components
• Junction box (JB): if the connection cable between the transceiver assembly and the
control and monitoring unit is required to be more than 15 m, there shall be a junction
box to support the connection between the transceiver and the control and monitoring
unit.
• Audit Module Assembly Audit targets
• Sealing air compressor with filter
• Extended monitoring system supporting up to 16 transceivers