Commissioning
40
8 Commissioning
Before starting the system for the first time after completing the installation, please check
and confirm that all parts an installed correctly are installed according to the instructions,
and that all the connections are secured and no leaking. Check and confirm all the electrical
connections are correct according to the instructions.
8.1 Start of the system
Now you can switch on the power supply, configure, and finally align the transceiver/re-
flector.
Following actions should be carried out to configure each transceiver:
Align the transceiver and reflector: refer to section 6.1.2
Set unit address: refer to section 6.1.3
Save new settings: refer to section 6.1.4
8.2 Calibration
Now you can calibrate the system following the instructions in chapter 7.
8.3 Setting of Alarm Levels
Alarm level shall be set up following the requirement of each application. Please follow
the instruction to configure alarm level for each transceiver in section 4.2.5 Sensor Setup.
8.4 Setting of Signal outputs
Signal outputs (analog and digital) shall be set up following the requirement of each appli-
cation. Please follow the instruction to configure signal output for the system in section
6.2.6 System Setup

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GREEN INSTRUMENTS G16 and is the answer not in the manual?

GREEN INSTRUMENTS G16 Specifications

General IconGeneral
BrandGREEN INSTRUMENTS
ModelG16
CategoryBoating Equipment
LanguageEnglish