4. Assembly and Installation
38 PNEG-1156ETL Design III Series Grain Stir-Ator CSA
Lifting Stir-Ator
1. The Stir-Ator is now ready to be lifted into position. Use a chain hoist, winch or block and tackle.
At the center, use the center lift hook on top of the suspension tee. (See Figure 4AI.)
Figure 4AI
2. At the bin wall, wrap the lifting mechanism around the trolley motor side of the frame rail.
(See Figure 4AJ.)
Figure 4AJ
Be sure that the lifting equipment is capable of lifting the unit. (See chart
on Page 17.)