4. Assembly and Installation
PNEG-1156ETL Design III Series Grain Stir-Ator CSA 39
3. Always fasten the trolley securely with vise grips or another suitable tool so that it cannot roll back
and forth on the frame rails. Keeping the trolley toward the center of the bin will make lifting the
Stir-Ator track unit into place easier. (See Figure 4AK.)
Figure 4AK
NOTE: Check that the shut off hook end of the suspension tube is located properly in relation to the
shut off switch box. (See Figure 4AL.)
Figure 4AL