EasyManuals Logo

Haas VF-1 User Manual

Haas VF-1
564 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #87 background imageLoading...
Page #87 background image
8796-8000
June 1999
OPERATION
7) Push the NEXT TOOL key and the Z-axis will retract to tool change position and tool #2 (empty)
will be installed in the spindle. Put your tool #2 into the spindle and jog to Z zero as you did for
tool #1. The cursor will automatically be on offset #2. Push TOOL OFSET MESUR.
8) Repeat this procedure until all tools are measured and installed.
9) MDI a T1 M6 to return to tool #1.
10) You are now ready to run your program.
11) Please note that in order to load and measure all of your tools, you do not need to use any keys
other than JOG, TOOL OFSET MESUR, and NEXT TOOL. Also note that this automatic offset
measurement works with G43 only.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Haas VF-1 and is the answer not in the manual?

Haas VF-1 Specifications

General IconGeneral
BrandHaas
ModelVF-1
CategoryPower Tool
LanguageEnglish

Related product manuals