18
INSTALLATION
June 1999
96-8000
FINAL A NCHORING
CAUTION! The Initial Setup and Leveling Procedures must be completed before final
anchoring.
Once the epoxy has cured remove the studs, the floor plates, and the 5/8 nut and washers, from each hole.
Move the machine into position.
Screw the short threaded end of the studs into the coupling nuts, making sure the base casting does not
interfere with the studs.
Assemble the anchors as shown in the Figure.
Final Anchor assembly