EasyManua.ls Logo

HEIDENHAIN TNC 430 - Page 236

HEIDENHAIN TNC 430
502 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
210 8 Programming: Cycles
8.3 Cycles for Drilling, Tapping and Thread Milling
2 TAPPING
With a floating tap holder
17 RIGID TAPPING
Without a floating tap holder
18 THREAD CUTTING
206 TAPPING NEW
With a floating tap holder, with automatic pre-
positioning, 2nd set-up clearance
207 RIGID TAPPING NEW
Without a floating tap holder, with automatic pre-
positioning, 2nd set-up clearance
209 TAPPING W/ CHIP BRKG
Without a floating tap holder, with automatic pre-
positioning, 2nd set-up clearance, chip breaking
262 THREAD MILLING
Cycle for milling a thread in pre-drilled material
263 THREAD MLLNG/CNTSNKG
Cycle for milling a thread in pre-drilled material and
machining a countersunk chamfer
264 THREAD DRILLING/MLLNG
Cycle for drilling into the solid material with
subsequent milling of the thread with a tool
265 HEL.THREAD DRLG/MLG
Cycle for milling the thread into the solid material
267 OUTSIDE THREAD MLLNG
Cycle for milling an external thread and machining a
countersunk chamfer
Cycle Soft key

Table of Contents

Related product manuals