Commissioning
11
22
Fig. 13: Transport lock
1 Spacer sleeves
2 Screws
The lid is closed.
The mains cable is disconnected from the device.
1. Tilt the device on the back of the device.
2. Insert 2 spacer sleeves (
1
).
3. Screw in 2 screws (
2
).
5
Commissioning
5.1 Unpacking the centrifuge
CAUTION
Danger of crushing due to parts falling out of the transport
packaging.
Keep the device balanced during the unpacking
process.
Only open the packaging at the points provided for this
purpose.
CAUTION
Risk of injury from lifting heavy loads.
Provide an adequate number of helpers.
Note the weight. See
Chapter 3 ‘Device overview’
on page 9
.
NOTICE
Damage to the device due to improper lifting.
Do not lift the centrifuge by the control panel or the
control panel holder.
Personnel:
Trained user
1. Open the box at the top.
2. Remove the padding.
3. Remove the device and accessories by lifting them up out of the box.
4. Place the device on a stable and level surface.
5.2 Remove the transport lock
Personnel:
Trained user