EasyManua.ls Logo

HM Electronics EOS HD - Equipment Installation; Base Station Installation

Default Icon
127 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
EQUIPMENT INSTALLATION
12
4. EQUIPMENT INSTALLATION
These instructions are for installation of standard EOS|HD equipment and most commonly used
optional equipment. Specic instructions may also be enclosed with optional equipment.
If you haven’t already done so, plug the battery charger into an AC electrical outlet and charge all of the
headset batteries while the other equipment is being installed. Refer to Section 2.3, pg. 8.
4.1 Base Station Installation
Things to consider before and during base station installation
h The base station should be located where, standing with your back to the wall, you can see
most of the work area where headsets will be used.
h The number of walls between the base station and where the headsets will be used should be
minimized.
h Sheets of stainless steel on the walls may shield or reect radio signals.
h Outside coverage may be needed for Speed Team (see pg. 50) operation.
h Large windows allow signals to pass freely, improving outside coverage.
h The antenna coverage area can be extended with the Remote Antenna Kit.
h Note the location of the store’s Wi-Fi access point, and avoid installing the base station
within six feet.
h If a system is being replaced, it may not be desirable to use the same mounting location for
the new base station, but it may be required in some cases.
h If using a power source other than that supplied by HME, the power source must provide 24
volts DC regulated to +/-5%, be capable of supplying a minimum of 50 watts of power and
be “LPS” rated for safe operation of the unit. The power source must meet all applicable local
regulatory requirements.