EasyManua.ls Logo

Honeywell 900U02-0100 - Page 258

Honeywell 900U02-0100
286 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
244 ControlEdge HC900 Process & Safety Controller User and Installation Manual Revision 10
May 2019
16 Point AC Digital Input
Step
Action
2
Mount RTP to DIN rail.
Latch to rail. See page 258.
Connect cable to RTP
3
Set/verify jumper positions as shown.
Module Removal / Insertion Under Power (RIUP) is supported by turning off Switch SW1 to allow removal of
the module from the rack without causing an arc. See page 85.
ATTENTION: SW1 only disconnects L1, not both sides of the AC powerline.
See page 246 for RTP internal schematic.
Jumper open
Jumper closed

Table of Contents

Related product manuals