CGW-MB Installation and Users’ Manual | P/N:LS10248-000HW-E | REV.G | JUL/31/2022 171
Morley-IAS Panels Connecting to the Panels
For the External Power Supply:
On the CLSS Gateway mainboard Side
1. Connect to the 24V DC external power supply or to the panel’s 24V DC power port.
2. Ensure that the S7 switch next to the RS-232 port is switched towards NUP_OUT.
Figure C.24: The S7 Switch
On the Panel Side
In the SK4 or SK5 terminal,
Connect the RS-232 cable for the non-resettable internal power.