Revision 1.0 SMV800 Modbus User's Guide Page 193
Device
Variables
Status
Bad Totalizer
The Totalizer
calculation has failed.
Possible causes is
same as that of Bad
Flow.
Refer the steps for
Bad Flow
Bit - 5
117
New Field
Verify that the DP
input is within
specifications and if
so adjust URV as per
need.
Bit - 6
New Field
Differential pressure
measured is below
LRV
Verify that the DP
nput is within
specifications and if
so adjust LRV as per
need.
Bit - 7
New Field
Static pressure
measured is above
URV
Verify that the SP
input is within
specifications and if
so adjust URV as per
need.
Bit - 8
New Field
Static pressure
measured is below
LRV
Verify that the SP
input is within
specifications and if
so adjust LRV as per
need.
Bit - 9
New Field
Process
Temperature
measured is above
URV
Verify that the
temperature input is
within specifications
and if so adjust URV
as per need.
Bit - 10
New Field
Process
Temperature
measured is below
LRV
Verify that the
temperature input is
within specifications
and if so adjust LRV
as per need.
Bit - 11
New Field
Meter body
Temperature
measured is above
URV
Verify that the meter
body ambient is
within specifications
and if so adjust URV
as per need.
Bit - 12
New Field
Meter body
Temperature
measured is below
LRV
Verify that the meter
body ambient is
within specifications
and if so adjust LRV
as per need.
Bit - 13
New Field
Flow measured is
above URV
Verify that the Flow
value expected is with
in URV if not adjust
the Flow URV.
Bit - 14
New Field
Flow measured is
below LRV
Verify that the Flow
value expected is
within specifications
and if so adjust Flow
LRV
Bit - 15

Table of Contents

Other manuals for Honeywell SMV800

Related product manuals