Procedure references
• 5800-48G-PoE+ (2 slots)
• 5800-48G-PoE+ TAA (2 slots)
• 5820X-14XG-SFP+ (2 slots)
• 5820X-14XG-SFP+ TAA (2 slots)
Figure 5
1. Attaching the mounting brackets to the chassis (for
all the switches except the
5800AF-48G/5820AF-24XG).
2. Rack-mounting a 5800/5820X switch except the
5
800AF-48G/5820AF-24XG.
• 5800AF-48G
• 5820AF-24XG
Figure 6
1. Attaching the mounting brackets, chassis rails, and
gr
ounding cable to the chassis
(5800AF-48G/5820AF-24XG).
2. Rack-mounting a 5800AF-48G/5820AF-24XG
swi
tch.
• All other 5800 switches
• 5820X-24XG-SFP+
• 5820X-24XG-SFP+ TAA
Figure 7
1. Attaching the mounting brackets to the chassis (for
all the s
witches except the
5800AF-48G/5820AF-24XG).
2. Rack-mounting a 5800/5820X switch except the
5
800AF-48G/5820AF-24XG.
Figure 5 Rack-mounting procedure (1)
Figure 6 Rack-mounting procedure (2)
Figure 7 Rack-mounting procecure (3)
NOTE:
If a rack shelf is available, you can put the switch on the rack shelf, slide the switch to an appropriate
location, and attach the switch to the rack with the mounting brackets.