EasyManua.ls Logo

HP 8712ES - Page 50

HP 8712ES
507 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2-16 ES User’s Guide
Getting Started
Performing the Operator's Check
Figure 2-10 Connect the Load to Port 2
11.Verify that the data trace falls below 30 dB. If the data trace is off
the screen, press and the key
until the trace moves up onto the screen.
12.Disconnect the load from port 2 and connect it to port 1 as shown in
Figure 2-11.
Figure 2-11 Connect the Load to Port 1
13.Press .
SCALE
Reference Level
MEAS 1
S11 Refl Port1

Table of Contents

Other manuals for HP 8712ES

Related product manuals