EasyManua.ls Logo

HP Data Protector A.06.11 - Setting Scheduling Options

HP Data Protector A.06.11
180 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5. Set scheduling options by checking the appropriate boxes.
Figure 25 Setting scheduling options
.
Scheduled events keep Media Operations in sync with the Backup Manager:
Config Report collects clients on the Backup Manager, MMDB configuration,
media pools, devices, and backup specifications.
Device Scan scans all devices to determine media loaded in them.
Full Media retrieves all media from the Backup Manager.
Incr Media retrieves all media modified in the past hour plus their usage in-
formation.
6. Check Enable Location Updates if you want requests to change a media location
in Media Operations to be automatically copied back to the Backup Manager
media location. Click Next.
User guide 73

Table of Contents

Other manuals for HP Data Protector A.06.11

Related product manuals