Removal and replacement procedures 108
OCP mezzanine card (optional)
WARNING: To reduce the risk of personal injury from hot surfaces, allow the drives and the
internal system components to cool before touching them.
To install the component:
1. Power down the server (on page 20).
2. Disconnect all peripheral cables from the server.
3. Remove the access panel (on page 21).
4. Remove the riser cage (on page 70).
5. Remove the OCP mezzanine card bracket.
6. Locate the correct OCP mezzanine card bracket for your card.
a. Identify the name of the corresponding bracket for your OCP mezzanine card in the table below.
INTEL ; HPE CL Eth 1x25Gb XXV71 OCP FIO Adptr ; XXV710DA1OCPG
Mellanox : HPE CL Eth 1x50Gb MLX4Lx OCP FIO Adptr ; MCX4431A-GCAN
INTEL : HPE CL Eth 2x25Gb XXV71 OCP FIO Adptr ; XXV710DA2OCPG1
Qlogic : HPE CL Eth 2x10Gb Q41132 OCP Adptr ; QL41132HOCU
Qlogic : HPE CL Eth 2x25Gb Q41232 OCP Adptr ; QL41232HOCU
Mellanox : HPE CL Eth 2x25Gb MLX4Lx OCP Mezz Adptr ; MCX4421A-ACAN