HPE ProLiant DL360 - Removing and Replacing the Ball Bearing Rails

HPE ProLiant DL360
283 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Removing and replacing the ball bearing railsRemoving and replacing the ball bearing rails
WARNING:WARNING:
To reduce the risk of personal injury or damage to the equipment, you must adequately support
the enclosure during installation and removal.
PrerequisitesPrerequisites
Before you begin, be sure that you have the following items:
Appropriate screwdriver for the screws in the rack.
Optional installation tool (695539-001), if the rails were installed using it.
ProcedureProcedure
1. Power down the server.
2. Extend the server from the rack .
3. Disconnect the cabling.
4. Remove the server from the rack .
5. Place the server on a sturdy, level surface.
6. Do one of the following:
(Optional) Remove the rail without a tool.
(Optional) Remove the rail with the tool.
Removing and replacing the ball bearing rails 101