b. Route the cables from the lower drive box backplanes (boxes 4–6) to the SAS expander card in the
primary riser cage.
12. Install the access panel (Installing the access panel on page 37).
13. Install the server into the rack (Installing the server into the rack on page 53).
14. Connect each power cord to the server.
15. Connect each power cord to the power source.
16. Power up the server on page 32.
Installing a GPU card
Up to four double wide GPU cards can be installed in the following locations:
Installing a GPU card 91