EasyManua.ls Logo

Huawei DBS3900 - Page 132

Huawei DBS3900
556 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Procedure
Step 1 Install a monitoring signal cable between the CMUA and the BBU in an APM30H, as shown in
Figure 6-116.
1. Connect one end of the monitoring signal cable between the CMUA and the BBU to the
COM_IN port on the CMUA in the APM30H.
2. Connect the other end to the MON1 port on the UPEU in the BBU.
Figure 6-116 Installing a monitoring signal cable between the CMUA and the BBU in an
APM30H
Step 2 Install a monitoring signal cable between the APM30H and the IBBS200D or IBBS200T, as
shown in Figure 6-117 and Figure 6-118.
1. Connect one end of the monitoring signal cable between the APM30H and the IBBS200D
or IBBS200T to the COM_IN port on the CMUA on the cabinet door of the IBBS200D or
IBBS200T.
2. Connect the other end to the COM_485 port on the PMU in the APM30H.
DBS3900 (Ver.B)
Installation Guide
6 Outdoor Scenario with AC Power Supply (BBU Installed
in an APM30H)
Issue 06 (2011-09-15) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
119

Table of Contents

Other manuals for Huawei DBS3900

Related product manuals