Step 12 Check the end pressure gauge on the front of the cabinet. The pointer should be in the green
zone and the pressure reading should be greater than 1.6 MPa. Record the reading of the
pressure gauge. 8 hours later, observe the pressure gauge again. The pressure reading should
remain unchanged.
Step 13 Reinstall the battery modules, baffle panels, copper bars, cables, front panel, and fuse box in
sequence.
Step 14 Reinstall the battery management module.
Step 15 Press and hold the POWER ON/OFF button on the battery management module for more than
2s. The green indicator of the battery management module blinks at 4 Hz.
Step 16 After the green indicator of the battery management module blinks at 10 Hz, switch on the
battery circuit breaker on the SmartLi.
----End