Copyright © Huawei Technologies Co., Ltd.
Figure 3-1 Reserved clearances (unit: mm)
3.1.2 Tools and Instruments
Insulate installation tools to prevent electric shocks.
Prepare the following tools and meters indicated in Table 3-1 for installation.
Table 3-1 Tools and meters
Hammer drill and
drill bit Φ16