5 Removal and Installation
● Before performing operations described in this chapter, make sure that optional parts to
be installed are available and compatible. For details, see Intelligent Computing
Compatibility Checker.
● After parts replacement, upgrade the software,
rmware, and CPLDs of the new
components to either the version in the customer environment (recommended) or to
the latest version. For details, see
TaiShan Rack Server iBMC User Guide
and
TaiShan
Rack Server Upgrade Guide
.
● After parts replacement, restore component congurations (including iBMC, BIOS, and
RAID congurations) on the customer live network.
5.1 Tool Preparations
5.2 ESD Protection
5.3 Safety Symbols on Devices
5.4 Basic Operations
5.5 (Optional) Front Bezel
5.6 Drive
5.7 PSU
5.8 Chassis Cover
5.9 Air Duct
5.10 Fan Module
5.11 Riser Module
5.12 PCIe Card on a Riser Module
5.13 Battery
5.14 Screw-in RAID Controller Card
5.15 Supercapacitor
5.16 DIMM
5.17 FlexIO Card
TaiShan 200 Server
Maintenance and Service Guide (Model 2280) 5 Removal and Installation
Issue 04 (2020-01-16) Copyright © Huawei Technologies Co., Ltd. 71