EasyManua.ls Logo

Huawei TaiShan 200 2280 - Front Drive Backplane

Huawei TaiShan 200 2280
209 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Figure 5-77 Installing a FlexIO card
Step 8 Tighten the screw using the Phillips screwdriver to secure the FlexIO card. See (2)
in Figure 5-77.
A tool is required for this operation.
Step 9 Install the server. For details, see 5.4.3 Installing the Server on Guide Rails.
Step 10 Connect network cables, or optical modules and optical cables to the FlexIO card.
Step 11 Connect the power cables. For details, see 5.7 PSU.
Step 12 Power on the server. For details, see 5.4.1 Powering On the Server.
Step 13 Log in to the iBMC WebUI, and check whether the new component is normal. For
details, see the
TaiShan Rack Server iBMC User Guide
.
----End
5.18 Front Drive Backplane
NO TICE
This section uses the server with Kunpeng 920 7260, 5250, or 5230 processors as
an example to describe the internal structure of a server. The procedures for
removing and installing the front drive backplane are the same for the server
congured with Kunpeng 920 5220 or 3210 processors.
TaiShan 200 Server
Maintenance and Service Guide (Model 2280) 5 Removal and Installation
Issue 04 (2020-01-16) Copyright © Huawei Technologies Co., Ltd. 138

Table of Contents

Related product manuals