C20013FF
Explanation: ISL roadmap initialized successfully
Response:
1. Go to Recovering the system firmware.
2. Replace the system-board, as described in Replacing the system-board and chassis assembly.
C2001400
Explanation: Initializing SP Communication Area #1
Response:
1. Go to Recovering the system firmware.
2. Replace the system-board, as described in Replacing the system-board and chassis assembly.
C2001410
Explanation: Initializing startup parameters
Response:
1. Go to Recovering the system firmware.
2. Replace the system-board, as described in Replacing the system-board and chassis assembly.
C20014FF
Explanation: Startup parameters initialized successfully
Response:
1. Go to Recovering the system firmware.
2. Replace the system-board, as described in Replacing the system-board and chassis assembly.
C2002100
Explanation: Power on racks
Response:
1. Go to Recovering the system firmware.
2. Replace the system-board, as described in Replacing the system-board and chassis assembly.
C2002110
Explanation: Issuing a power on command
Response:
1. Go to Recovering the system firmware.
2. Replace the system-board, as described in Replacing the system-board and chassis assembly.
C20013FF • C2002110
252 Power Systems: IBM Flex System p260 and p460 Compute Nodes Installation and Service Guide

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the IBM Flex System p260 and is the answer not in the manual?

IBM Flex System p260 Specifications

General IconGeneral
BrandIBM
ModelFlex System p260
CategoryServer
LanguageEnglish

Related product manuals