EasyManuals Logo

IBM Flex System p260 User Manual

IBM Flex System p260
524 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #305 background imageLoading...
Page #305 background image
D11A1XXX
Explanation: Dump any state information before dumping starts
Response:
1. Go to Checkout procedure.
2. Replace the system-board, as described in Replacing the system-board and chassis assembly.
D11B1XXX
Explanation: Dump /proc filesystem
Response:
1. Go to Checkout procedure.
2. Replace the system-board, as described in Replacing the system-board and chassis assembly.
D11C1XXX
Explanation: Dump mounted filesystem statistics
Response:
1. Go to Checkout procedure.
2. Replace the system-board, as described in Replacing the system-board and chassis assembly.
D11D1XXX
Explanation: Dump environment
Response:
1. Go to Checkout procedure.
2. Replace the system-board, as described in Replacing the system-board and chassis assembly.
D1231XXX
Explanation: Dump update dump headers
Response:
1. Go to Checkout procedure.
2. Replace the system-board, as described in Replacing the system-board and chassis assembly.
D1241XXX
Explanation: Dump CRC1 calculation off
Response:
1. Go to Checkout procedure.
2. Replace the system-board, as described in Replacing the system-board and chassis assembly.
D11A1XXX • D1241XXX
Chapter 8. Troubleshooting 293

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the IBM Flex System p260 and is the answer not in the manual?

IBM Flex System p260 Specifications

General IconGeneral
BrandIBM
ModelFlex System p260
CategoryServer
LanguageEnglish

Related product manuals